Share this post on:

In Table 1 are shown in Figure five. For instance, (1, 1, 4, 3) indicates the ore block numbered (four, 3) inside the strategy view in (1, 1) sublevel.Table 1. Calculation outcomes. Number (1, 1, four, 3) (1, 1, 8, three) (1, 1, 11, three) (1, 1, 1, 2) (1, 1, 6, 2) (1, 1, 9, 1) (1, 1, 12, 1) (two, 1, 1, 3) (two, 1, 4, 3) (two, 1, 10, 3) (2, 1, two, 1) (2, 1, 5, 1) (2, 1, eight, 1) (two, 1, 11, 1) (two, 1, 7, 3) Other folks Outcome 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 Total Arimoclomol manufacturer Storage/t 2883.92 2951.56 2631.26 2951.37 2601.16 2667.56 2916.49 2643.29 2708.67 2947.29 2938.19 2646.24 2951.56 2969.06 2671.67 / Remaining Storage/t 2883.92 2951.56 2631.26 2951.37 2601.16 2667.56 2916.49 2643.29 2708.67 2947.29 2938.19 2646.24 2951.56 2969.06 2671.67 / Grade/ 24.03 61.74 44.26 36.46 49.15 49.28 56.74 35.77 42.90 31.48 52.25 54.64 61.74 44.26 48.00 /5.1.two. Haulage Equipment Dispatch Plan The short-term resource strategy indicates that there are actually 15 stopes inside the plan period, seven stopes in (1, 1) sublevel, and eight stopes in (2, 1) sublevel. According to the production Orexin A References arrangement with the mine, there are two ore passes within the 1st level and three ore passes in the second level through the strategy period. The travel time parameters on the scrapers and electric locomotives measured by the mine are shown in Tables two.(two, 1, 11, 1) (two, 1, 7, 3) OthersMetals 2021, 11,1 12969.06 2671.67 /2969.06 2671.67 /44.26 48.00 /16 ofThe total income throughout the plan period is 5,325,966 dollars.SublevelRoof LevelFigure 5. Basic spatial model of ore blocks. Figure five. Uncomplicated spatial model of ore blocks.five.1.2. Haulage Equipment Dispatch PlanThe total income through the strategy period is five,325,966 dollars.Table two. Loaded travel time ofshort-term resource strategy indicates that you can find(Units: s). The the scraper involving the stope and ore pass in (1, 1) sublevel/s 15 stopesOre Passa (1, 1, 4, 3)A B75.five 154.within the plan per seven stopes in (1, 1) sublevel, and eight stopes in (two, 1) sublevel. According to the p Stope/(Number) duction arrangement on the mine, you will find two ore passes within the initial level and three b c d e f g passes in three) second11, 3) for the duration of 1, two) program period. The travel time parameters of your sc the (1, 1, level the (1, 1, 8, (1, 1, (1, 1, six, 2) (1, 1, 9, 1) (1, 1, 12, 1) ers and electric locomotives measured by the mine are shown in Tables 2. 149.three 179.2 97.eight one hundred.5 145.six 210.85.6 96.two 205.2 137.3 79.7 100.Table three. Empty travel time of the scraper in between the stope and ore pass in (1, 1) sublevel/s (Units: s). Stope/(Number) Ore Pass a (1, 1, 4, three) A B 52.49 110.7 b (1, 1, eight, three) 105.7 57.five c (1, 1, 11, 3) 147.5 61.three d (1, 1, 1, two) 64.5 144.two e (1, 1, six, two) 67.eight 84.six f (1, 1, 9, 1) 104.three 54.0 g (1, 1, 12, 1) 172.6 68.Table four. Loaded travel time in the scraper between the stope and ore pass in (two, 1) sublevel/s (Units: s). Stope/(Quantity) Ore Pass s (2, 1, 1, three) C D E 87.three 157.6 214.7 t (2, 1, four, 3) 86.7 133.three 195.7 u (two, 1, 7, 3) 144.7 92.3 113.8 v (two, 1, 10, three) 173.7 132.7 56.4 w (two, 1, 2, 1) 91.eight 145.7 215.three x (two, 1, 5, 1) 114.7 87.two 187.3 y (2, 1, 8, 1) 152.9 67.1 105.4 z (2, 1, 11, 1) 177.4 134.7 80.Table five. Empty travel time of the scraper in between the stope and ore pass in (2, 1) sublevel/s (Units: s). Stope/(Number) Ore Pass s (two, 1, 1, three) C D E 54.5 110.3 162.3 t (2, 1, four, three) 54.2 89.6 141.4 u (2, 1, 7, three) 106.7 56.7 72.7 v (2, 1, ten, three) 129.8 90.5 34.three w (two, 1, 2, 1) 56.three 107.3 160.9 x (two, 1, 5, 1) 73.two 55.1 137.9 y (two, 1, 8, 1) 111.4 43.eight 69.6 z (2, 1, 11, 1) 132.three 92.3 51.Metals 2021, 11,17 ofTable 6. Loaded travel time.

Share this post on:

Author: Proteasome inhibitor